Project

General

Profile

Gantt

Filters

Zoom in Zoom out « July | September »

months from Apply Clear

Feature #3: .Net training
Training #21: Angular Training
Training #22: Angular Training
Training #25: Angular Training
Training #26: Android Training
Training #24: Customer Support Chat project
Training #44: Training Project (Chat Manager)
Training #51: Angular Training
Feature #88: Magento Configure Application
Training #96: PHP And PHP Framework Training
Training #97: Laravel Training
Training #108: Learning About Security testing
Training #176: Learn AI and ML from A-z machine learning course on Udemy
Training #219: Angular js Training
Training #236: Flutter Training
Feature #261: Flutter Training
Training #296: Angular training
Training #297: .Net Training
Feature #326: Learn Node JS
Support #330: DS Training -QA
Training #234: Understand of DS Projects
Training #402: RPMS module code
Training #425: Learning of Projects understanding -ds and clover
Training #441: DS Training
Training #444: DS Training
Support #447: Taking kt of ds Projects (QA)
Support #453: Taking kt of ds Projects (QA)
Feature #429: Worked on to create DB content and action in CompanyController
Feature #493: Learn Node JS (Kunal Jangid
Feature #517: Work on UI Purium task
Feature #525: Project Understanding
Feature #556: Add User and Company page in Base Code - angular 8
Feature #617: Taking DISCO training on Planio
Feature #616: Ios training and set up work
Bug #624: Learning-Firebase Admob
Feature #632: For node js base project
Feature #633: Learn-Node js
Feature #640: Enrollment Code Review
Feature #646: Clover internal Work
Feature #657: Swagger Learning
Feature #663: Base Project-MVC
Feature #667: Clover internal Work
Feature #671: setup & Create a new project in .net mvc
Feature #681: Understand and check filter implemetation.
Feature #683: wordpress setup and discussion with jaishiv regarding projects and work flow
Training #707: Flutter Learning - Clip Methods
Feature #729: Ios training
Feature #734: Flutter Learning- Animation
Training #738: Design Patterns- Flutter
Training #739: Notification Implementation
Training #740: Lifecycle and Architectures- Flutter
Feature #746: BEHOLD_Testing, UI work and bug fixing
Bug #752: Learn Unity Language
Feature #756: RND about Twillio service or new message service implementation
Feature #758: .net core with external login process
Feature #762: create ticket understanding nuget package utility package
Training #765: Learning Flutter
Feature #766: Taking learning on Angular
Feature #767: Taking Understanding on the directscale portal documents-DS
Feature #776: Scrollable APP Bar
Feature #779: Training-Reminder App
Feature #780: Understanding of iOS Projects
Feature #781: Fixing UI issues
Feature #783: Demo App with Flavoring in IOS
Feature #789: DS-Training -Project understanding DS Api
Feature #790: Retail shop training-DS
Training #799: Kotlin Language Preparation
Training #800: Linking b/w firebase and node.js
Training #806: React JS training
Feature #810: Reminder App-Updation of reminder app ui and functionalities
Feature #821: Demo project-Login Signup Sample in IOS
Project Management #822: Check Previous Demo App Project
Feature #823: Firebase Firestore Database opretion with Authentication
Feature #824: Create a log file in external storage code in Flutter Base project.
Feature #825: demo Remote Config Firebase API in "Base Project"
Feature #664: Flutter taining
Feature #829: Base Project in flutter -Small File Manager Application
Feature #828: Given kt on Project-MW Property
Feature #833: Behold Project Video calling face detection
Feature #845: TEAMLINK-taking kt and project understanding
Feature #843: Angular training -Taking kt from saurabh
Feature #846: Angular training
Training #699: Flutter Learning
Training #849: Flutter training -demo youtube application
Feature #853: React.js or React Native learning recall"
Feature #854: Team link Server side Node.js Code understanding"
Feature #855: Behold -Taking kt on this project
Feature #860: Projects Knowledge -Angular training
Feature #861: Socket Learning
Project Management #862: Recommended tutorials for trainee
Feature #863: Food ordering app sample App
Feature #864: Chat App Interact With Each Other (Instant Messaging App)
Feature #865: Implementation sample chat app using Socket.IO IOS side
Feature #866: Getting knowledge & understanding about AWS server
Feature #867: Sample Base Android Project Specific Major Topics Cover
Feature #868: Chat App- for one to one messaging using socket in Flutter
Feature #869: Projects KT and handover status by Rohit
Feature #870: demo app- for get device audio, video, image, doc files
Feature #871: Training -KT sessions By Karishma
Training #872: IOS /swift , Topic cover under training(Base Project)
Feature #873: IOS interview & Technical task assigned
Training #874: Angular training
Feature #875: Read-Write Demo SMS App
Feature #876: Getting React js languages- idea
Feature #877: IOS Training -Udemy
Feature #878: Creating App IOS side file manager
Feature #879: Documentation Work -For Process
Training #881: Project Training-Purium
Training #882: Training
Training #883: Training
Feature #884: Behold Code Running & Testing IOS side
Feature #885: Teamlink Flutter Migration App Code".
Training #887: Angular training
Training #888: Angular training
Training #889: Angular training
Training #890: Angular training
Training #891: Angular training
Training #892: Angular training
Training #893: Angular training
Training #894: Shopify Training
Training #895: HTML/CSS/JAVASCRPIT training
Training #896: Project Training
Bug #897: Internal -- system issue resolving, ram upgrade, windows installation, software installation
Training #898: Project Training
Feature #899: Firebase notification Sample Test update
Training #900: Angular with Angular Materials
Training #901: Angular with Angular Materials
Training #902: Angular with Angular Materials
Feature #903: Disco Training
Training #904: Angular Materials
Training #905: Angular with Angular Materials
Training #907: Angular with Angular Materials
Training #908: Angular with Angular Materials
Training #909: Angular with Angular Materials
Training #910: Project Training - IOS Flavoring for multiple company manage
Bug #911: System software issue- Reinstalled all tools and Android Setup
Feature #912: Create sample app in Shift UI IOS
Training #913: Process documentation training
Training #914: Angular training
Training #915: Project Training
Training #916: Project Training
Training #917: Project Training
Training #918: Project Training
Training #919: Project Training
Training #920: Project Training
Training #921: Project Training
Feature #922: Node as frontend & MVC Pattern"
Feature #923: Angular Training
Feature #924: New project-Leanardo 247
Bug #925: system software re-installation android.
Feature #926: Call Management System App
Training #927: .NET CORE TRAINING
Training #928: .NET CORE TRAINING
Training #929: .NET CORE TRAINING
Training #930: .NET CORE TRAINING
Training #931: .NET CORE TRAINING
Training #932: .NET CORE TRAINING
Feature #933: Review a new Project document & Prepare a detailed Estimation in sheet.
Training #934: React js training
Training #935: Leo Project Training
Training #936: Angular training
Training #937: React js training
Feature #938: IOs Training
Training #939: Angular JS training
Training #940: Angular training
Training #941: Project Training
Training #942: Safety Inspector -Project
Training #943: Project Training
Training #946: #2684:- Review API for web office project
Training #947: Project Training
Training #948: Node js training
Training #951: Front end tasks
Training #952: Front end tasks
Training #949: Python Training
Training #953: Leo Project Training
Training #954: Project Task- Rain
Training #955: Project Task - Rain
Training #956: Leo Task
Training #957: Angular Training
Training #959: Devops Project KT & Training
Support #960: QA- Project KT
Support #961: Node JS Traning
Support #962: Devops KT training
Support #963: Project KT and Training
Training #965: Angular Training
Support #966: Shopify Training
Support #967: Angular training
Training #969: .Net training
Training #973: .Net Training
Training #974: .Net Training
Training #975: .Net Training
Training #977: Angular training
Support #976: Angular training
Support #978: basic project
Support #986: .Net training
Training #1026: Angular Training
Training #1027: Angular Training
Training #1028: Angular Training
Support #1029: .Net training
Training #1030: .Net training
Training #1031: .Net training
Support #1032: Android Training
Support #1033: Devops KT & Training
Training #1035: .Net training
Support #1042: Ios training
Training #1050: Project training and KT
Support #1051: Project training and KT
Training #958: AWS Devops training
Feature #1070: CRM form
Support #1071: project management "work status"
Support #1072: Angular training
Training #1109: Ziplingo Project-KT
Support #1111: Node JS training
Training #1133: Understanding of Unify Project.
Support #1149: New tools learning - jmeter
Support #1195: Learning, Implementation and Working on GraphQL.
Support #1214: .NET training
Training #1253: React native
Feature #1256: Python learning
Support #1293: learning about Neumi project
Training #1299: Leonardo training
Training #1306: Angular Learning with Udemy course
Training #1377: Wordpress training
Support #1379: All project KT for dev ops including paymenture , zipligno, wsi , rain and database.
Support #1389: Amazon Redshift learning
Support #1393: Understand about Amazon Personalize
Bug #1464: AI Learning
Training #1465: AI Learning
Training #1467: Python learning and understanding
Training #1532: Project Knowledge Transfer - Ecommerce Ziplingo
Training #1533: Project Knowledge Transfer - Ziplingo Ecommerce (Common sense )
Training #1540: Shopify training
Training #1541: Project Knowledge Transfer - Shopify understanding
Feature #1543: RE-designing of https://www.closingsdocsnow.com/
Training #1551: Wordpress Training and knowledge Transfer
Training #1553: React -> Training and Understanding
Training #1554: Angular training ticket
Training #1556: tranont Knowledge transfer Disco
Training #1563: Shopify training
Training #1569: Unified Messing Knowledge Transfer
Bug #1570: Project Knowledge Transfer for shopify
Training #1572: Angular JS training ticket
Training #1573: Wordpress Training and knowledge Transfer
Training #1579: WordPress and Shopify training
Training #1582: WordPress training ticket
Training #1587: Training for prompt engineering and course completion
Training #1597: Pillars Ecommerce - Code understanding and bug fixes
Training #1602: Technology learning
Training #1610: LEO training
Training #1623: Training - cursor AI - tool
Bug #2318: .Net Backend training -Feb
Bug #2319: .Net Backend Training
Bug #2321: Frontend Training -Feb
Bug #2322: Flutter Training -Feb (Mobile )
Bug #2372: Implement Account Category and Account Ledger Management in EVCMS
Bug #2373: charging-session/{session_id} and audit-log API to include Machine Name and Connector Number
Bug #2320: Frontend Training -Feb
Bug #2457: Calculation of Estimate Price Detail Page.
Bug #2495: Permission Checking on Whole Project - Check the Company Admin, Permission Based and Many conditions Check on Sidebar.
Bug #2502: Google Map Issues Checking
Bug #2516: Searching By Name, Email, and Mobile Number on User Management
Bug #2517: Master Data of Ledger, Ledger Accounts and Ledger Categories
Bug #2542: UI Changes and Make Responsive.
Bug #2584: Work on Translation Tools
Bug #2459: Archive Historical MongoDB Collection Data to S3 (CSV + Compressed Format)
Bug #2421: Implement Station Setup Tracking System with Step-wise Status and Audit Logs
Bug #2476: Station Setup UI Design and Functionality.
Bug #2489: Export Vendor Sessions Data to CSV/Excel
Bug #2494: ChargeWatch - Implement Assign & Resolve the Tickets Feature
Bug #2508: Customer Support tiket enhancements
Bug #2513: Implement Status Count API
Bug #2526: ChargeWatch: UI & Functionality Improvement
Bug #2527: Implement New Summary API Endpoint for Station-wise Performance Report
Bug #2530: ChargeWatch: Create An Issue Feature
Bug #2532: Charge Watch:- Create an Alert features
Bug #2535: Feature :- Charge Watch Create an bell Icon for Alert list
Bug #2548: Feature :- Charge Watch Create an BottomAppbar & UpdateApiAlert
Bug #2554: feature--- Ui Improvement
Bug #2564: Machine Performance Metrics with Downtime & Utilization Calculation
Bug #2566: Correction in Daily Statistics Calculation
Bug #2579: Charger Rate Correction
Bug #2583: feature--- Resolve to update status Ui Improvement
Bug #2589: ChargeWatch: IOS Push Notification Issue
Bug #2590: ChargeWatch: Initial delay issue
Bug #2592: Ticket Screen Ui Changes
Bug #2601: create a report where we can show the locationid of OCPI
Bug #2602: feature :- Service Page
Bug #2612: Implement RiverPod State-Management
Bug #2615: Dynamic Agreement Drafting & Template Management for Charging Stations
Bug #2618: feat-- Ui improvement in Ticket Details
Bug #2623: Station setup page enhancement changes or bugs resolving
Bug #2625: ChargeWatch - Expenses Module
Bug #2628: Report format changes Customer Info - Ledger / Session History/Session Report - Sales Voucher / Wallet Report - Accounting Vouchers
Bug #2631: Charge Watch - bug fix
Bug #2633: Create Error Analytics Report for Stations and Machines
Bug #2638: Ui Changes on Alert Screen
Bug #2639: Restrict normal users to login chargewatch app
Bug #2642: Implement Archived Files Listing & Download Functionality from S3 Bucket in UI
Bug #2646: Custom report and columns onfigurations
Bug #2647: Add toggle button for user to set online/offline in chargewatch app
Bug #2648: Show Service & Expense Module Remote Config Flag Based
Bug #2656: Dashboard stats changes - Average Active Session, Average Session Started per hour, Active Users, Total Users
Bug #2664: Sort ordering changes on all reports
Bug #2665: Enhancement on UI Changes , mobile ui changes, add the session guid filter, agreement page tabs changes, wallet report serach the user by name, email and phone, Sorting on whole Project
Bug #2667: Abandoned new tab on session management
Bug #2670: Alert Screen filters Should be show as per role
Bug #2671: Finance Management Module - Phase 1 (Employee Expenses & Cash Management Reports)
Bug #2675: Testing - Create and add a new section in partners slider to show partnerships and payout details for admin.
Bug #2677: Added the Company Partner on User Management.
Bug #2682: ChargeWatch: Role Base Changes
Bug #2683: Alert Notification Sound for High Priority Issues
Bug #2684: Assignment tab in charger modal popup
Bug #2688: Feat---Tool Tip at Service Checklist
Bug #2692: ChargeWatch: Handle Network Errors
Bug #2695: ChargeWatch: Add Service Button in Service dashboard (User can search station and add service as we do in upcoming stations)
Bug #2696: ChargeWatch: Dashboard Module
Bug #2699: Internal CMS User-to-User Messaging Module
Bug #2701: ChargeWatch: Expense Module Changes
Bug #2708: Show station setup tracking history on station setup page.
Bug #2711: ChargeWatch: Plan Visit Module
Bug #2714: Feature---Chargewatch add attachment at ticket details screen
Bug #2717: CMS aspect ratio fixes on 100% view
Bug #2723: ChargeWatch: Bug Fixes
Bug #2727: ChargeWatch: Pending Task at station
Bug #2728: Monthly closing UI changes on Version 2 page - UI Changes
Bug #2730: charging session extends
Bug #2735: Add / Check the Permission Testing and Validation on CMS
Bug #2743: Add the Permission of Station Detail Panel all tabs separate permissions added.
Bug #2745: Review and Optimize Application Logging Across All Services
Bug #2748: sation Visit expenses and personal expenses UI Implementation
Bug #2751: Partner Module - TDS Percentage
Bug #2756: ChargeWatch - Add Approval/ Reject process in Expense Module
Bug #2758: Add reason dropdown to the ticket and alert screen
Bug #2761: Need to work on Root Admin Permission for separate all permission check and made proper.
Bug #2762: Add expenses for visits also
Bug #2767: Chargejet-in app update
Bug #2773: Dashboard Cards changes
Bug #2777: ChargeWatch: Add Station Installation process module
Bug #2784: ChargeWatch - Add Import Pending Station Task option in Visit Plan Task
Bug #2787: Add Station Live Toggle in Station Configuration
Bug #2791: Root Admin Dashboard API and UI Changes
Bug #2792: Develop Station Cost Summary Report with Classification Breakdown and Advanced Filters
Bug #2793: ChargeWatch - Expense Module Changes
Bug #2794: Changes in service date on add station by default set to null
Bug #2796: Add an Export CSV feature to the Partner Payout page so users can download the displayed payout summary data as a CSV file.
Bug #2799: Expense Module Changes
Bug #2800: Charge jet charging screen ui changed
Bug #2803: ChargeWatch: IOS Splash Screen Issue
Bug #2804: .NET Learning - Concepts
Bug #2805: ChargeWatch: Implement Lottie Splash Screen
Bug #2814: User Ledger Report with Debit, Credit & Running Balance
Bug #2817: Charge Watch - Home Screen ui redesign
Bug #2819: My expenses Screen amount does not change
Bug #2824: Web app charging issue
Bug #2829: Web App & App write review
Bug #2830: Web App Extend Session
Bug #2831: Web App Charging Screen Stuck issue
Bug #2832: Vendor Id filter need on session detail report on UI and agreement
Bug #2833: Master Data Management - Amenities, etc Pages
Bug #2834: Change Api at Expanse and Visit Plan
Bug #2838: Charge watch - Expanse module screen implementation api & ui
Bug #2843: Station Expense Ledger Report - UI implementation
Bug #2847: Permission Display Name New field and New implementation for user friendly
Bug #2852: Charge Watch - passing employee user id data
Bug #2853: Charging error report changes
Bug #2856: Charge Watch – App closes when pressing the back button from any navigation tab
Bug #2863: Add Station Capital Tracking Module for Pre-Live Station Investment
Bug #2864: Charge Watch - Expense screen pass parameters for spending-overview
Bug #2865: Pass correct user id in transfer API
Bug #2866: Fix Total received calculation
Bug #2867: Fix Date Filter in field-operations/transfers API
Bug #2868: Do not show Add Money option on My expenses
Bug #2869: Charge Watch - minor/major bugfix
Bug #2870: Develop Sales Visit Planning & Expense Management Module
Bug #2873: Display Dashboard Banner During Daily Rollup Processing
Bug #2877: bugfix- Charge Watch- Loading issue at Station expense
Bug #2879: charge watch - expense screen closing balance update
Bug #2880: Fix UI Bugs and Styling Issues, Filters Section Boxes
Bug #2881: Charge Watch -Expenses Module - App Improvements
Bug #2886: New Partner CMS with new theme
Bug #2890: Move Monthly Closing, Expense Module, Payout Ledger, and Station Expense Ledger Report to Accounts Section
Bug #2892: Session Reports changes

Project

Status

Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
In Progress
New
New
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
In Progress
New
New
New
New
New
New
New
New
New
New
Closed
Resolved
New
In Progress
In Progress
New
New
Resolved
Resolved
New
Resolved
New
New
Resolved
New
In Progress
In Progress
New
New
New
Closed
New
New
New
In Progress
New
New
New
New
In Progress
New
New
In Progress
In Progress
New
New
New
New
New
New
New
New
In Progress
In Progress
New
New
Resolved
In Progress
In Progress
New
In Progress
New
In Progress
New
New
In Progress
In Progress
New
New
New
New
New
New
New
In Progress
New
New
New
New
New
In Progress
In Progress
New
New
New
In Progress
New
New
New
New
In Progress
New
In Progress
New
Updated
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
New
Resolved
New
New
New
New
New

Priority

Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
High
Normal
Normal
Normal
Normal
Normal
Normal
Normal
High
Normal
Normal
Low
Normal
High
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
High
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
High
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal

Assignee

Akash Agarwal
Pragya Saraswat

Updated

06/26/2024 05:36 AM
06/26/2024 05:36 AM
06/26/2024 05:36 AM
06/26/2024 05:36 AM
06/26/2024 05:36 AM
06/26/2024 05:36 AM
06/26/2024 05:36 AM
06/26/2024 05:36 AM
06/26/2024 05:36 AM
06/26/2024 05:36 AM
06/26/2024 05:36 AM
06/26/2024 05:36 AM
06/26/2024 05:36 AM
06/26/2024 05:36 AM
06/26/2024 05:36 AM
06/26/2024 05:36 AM
06/26/2024 05:36 AM
06/26/2024 05:36 AM
06/26/2024 05:36 AM
06/26/2024 05:33 AM
06/26/2024 05:36 AM
06/26/2024 05:33 AM
06/26/2024 05:33 AM
06/26/2024 05:33 AM
06/26/2024 05:33 AM
06/26/2024 05:33 AM
06/26/2024 05:33 AM
06/26/2024 05:33 AM
06/26/2024 05:33 AM
06/26/2024 05:33 AM
06/26/2024 05:33 AM
06/26/2024 05:33 AM
06/26/2024 05:33 AM
06/26/2024 05:33 AM
06/26/2024 05:33 AM
06/26/2024 05:33 AM
06/26/2024 05:33 AM
06/26/2024 05:33 AM
06/26/2024 05:33 AM
06/26/2024 05:33 AM
06/26/2024 05:33 AM
06/26/2024 05:33 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
11/02/2023 06:15 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
11/02/2023 06:15 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
11/02/2023 06:15 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:33 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
11/02/2023 06:15 AM
11/02/2023 06:15 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
11/02/2023 06:15 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
11/02/2023 06:15 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
11/02/2023 06:15 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
11/02/2023 06:15 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
11/02/2023 06:15 AM
06/26/2024 05:31 AM
06/13/2024 05:18 AM
08/22/2023 06:08 AM
08/22/2023 06:08 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
08/22/2023 06:11 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
11/02/2023 06:15 AM
06/26/2024 05:31 AM
06/26/2024 05:31 AM
06/26/2024 05:30 AM
06/12/2024 02:55 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/13/2024 05:16 AM
11/02/2023 06:15 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/13/2024 05:01 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/13/2024 05:15 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/13/2024 05:01 AM
06/13/2024 05:14 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:30 AM
06/26/2024 05:28 AM
06/26/2024 05:28 AM
06/26/2024 05:28 AM
06/26/2024 05:28 AM
09/25/2024 02:24 AM
06/26/2024 05:28 AM
06/26/2024 05:28 AM
06/10/2024 09:48 AM
06/26/2024 05:28 AM
08/22/2023 05:37 AM
08/22/2023 05:54 AM
10/10/2023 06:57 AM
06/26/2024 05:28 AM
06/26/2024 05:28 AM
06/26/2024 05:28 AM
08/22/2023 05:46 AM
08/22/2023 06:02 AM
10/10/2023 06:58 AM
06/26/2024 05:28 AM
09/25/2024 02:24 AM
08/22/2023 06:02 AM
06/26/2024 05:28 AM
06/26/2024 05:28 AM
08/22/2023 05:50 AM
06/26/2024 05:28 AM
08/22/2023 06:01 AM
06/26/2024 05:28 AM
11/02/2023 06:15 AM
06/10/2024 09:34 AM
06/26/2024 05:28 AM
06/26/2024 05:28 AM
06/13/2024 03:00 AM
06/26/2024 05:28 AM
06/10/2024 09:49 AM
06/26/2024 05:28 AM
06/26/2024 05:28 AM
06/26/2024 05:28 AM
06/26/2024 05:28 AM
06/26/2024 03:17 AM
06/26/2024 05:28 AM
06/13/2024 04:48 AM
06/26/2024 05:53 AM
09/25/2024 02:19 AM
06/26/2024 03:18 AM
06/26/2024 02:48 AM
06/26/2024 02:47 AM
07/29/2024 09:36 AM
07/29/2024 09:38 AM
09/26/2024 05:59 AM
11/21/2024 03:26 AM
12/26/2024 08:02 AM
12/13/2024 07:53 AM
12/13/2024 07:53 AM
12/13/2024 07:53 AM
01/02/2025 05:24 AM
12/26/2024 01:15 AM
12/26/2024 07:58 AM
12/31/2024 12:06 AM
01/20/2025 08:38 AM
02/13/2025 05:37 AM
02/19/2025 12:06 AM
02/21/2025 05:21 AM
02/27/2025 12:45 PM
03/05/2025 07:35 AM
03/06/2025 12:53 AM
03/07/2025 02:20 AM
03/25/2025 09:54 AM
04/16/2025 01:28 AM
04/29/2025 09:37 AM
05/19/2025 07:32 AM
06/08/2026 09:05 AM
03/12/2026 09:28 AM
02/23/2026 07:46 AM
02/23/2026 07:48 AM
03/26/2026 09:03 AM
03/13/2026 12:02 AM
07/07/2026 03:49 AM
04/14/2026 09:11 AM
04/15/2026 09:27 AM
04/16/2026 09:26 AM
04/28/2026 02:33 AM
05/29/2026 07:55 AM
07/20/2026 08:53 AM
07/22/2026 08:28 AM
04/24/2026 09:21 AM
04/09/2026 09:16 AM
04/10/2026 08:31 AM
04/14/2026 08:46 AM
04/22/2026 02:20 AM
04/20/2026 12:01 AM
04/22/2026 02:47 AM
04/27/2026 12:30 AM
05/01/2026 09:07 AM
04/27/2026 03:21 AM
04/28/2026 08:30 AM
04/28/2026 02:42 AM
04/30/2026 02:12 AM
05/05/2026 09:30 AM
05/13/2026 09:14 AM
05/04/2026 02:54 AM
05/06/2026 02:35 AM
05/07/2026 01:06 AM
05/08/2026 12:21 AM
05/08/2026 12:42 AM
05/11/2026 03:12 AM
05/11/2026 09:08 AM
05/12/2026 05:49 AM
05/13/2026 08:50 AM
06/01/2026 08:10 AM
05/14/2026 02:54 AM
05/28/2026 09:32 AM
05/18/2026 12:47 AM
05/18/2026 09:25 AM
05/20/2026 05:44 AM
05/28/2026 09:34 AM
05/21/2026 05:11 AM
05/21/2026 05:43 AM
06/26/2026 08:58 AM
06/23/2026 09:05 AM
05/26/2026 01:12 AM
05/26/2026 01:53 AM
05/29/2026 09:21 AM
06/02/2026 09:31 AM
06/17/2026 09:18 AM
06/03/2026 09:20 AM
06/04/2026 01:01 AM
06/10/2026 08:55 AM
06/03/2026 09:28 AM
06/03/2026 09:28 AM
06/04/2026 04:53 AM
06/04/2026 05:07 AM
06/04/2026 09:05 AM
06/05/2026 01:55 AM
06/05/2026 07:51 AM
06/08/2026 02:33 AM
06/08/2026 05:35 AM
06/10/2026 09:07 AM
06/09/2026 01:22 AM
06/11/2026 09:07 AM
06/10/2026 01:23 AM
06/12/2026 09:20 AM
06/11/2026 09:18 AM
06/12/2026 01:11 AM
06/12/2026 08:14 AM
06/12/2026 09:15 AM
06/15/2026 09:12 AM
06/16/2026 08:58 AM
06/18/2026 09:10 AM
06/17/2026 09:26 AM
06/30/2026 09:03 AM
06/19/2026 07:44 AM
06/22/2026 04:48 AM
06/22/2026 05:25 AM
06/24/2026 08:54 AM
06/22/2026 07:51 AM
06/23/2026 04:42 AM
06/25/2026 09:18 AM
06/25/2026 08:15 AM
06/30/2026 05:31 AM
07/03/2026 09:13 AM
07/08/2026 09:09 AM
07/02/2026 09:06 AM
07/02/2026 01:45 AM
07/02/2026 08:58 AM
07/03/2026 09:26 AM
07/03/2026 07:53 AM
07/03/2026 08:42 AM
07/06/2026 04:58 AM
07/06/2026 08:53 AM
07/07/2026 12:25 AM
07/15/2026 09:02 AM
07/10/2026 09:16 AM
07/09/2026 08:54 AM
07/13/2026 03:09 AM
07/13/2026 06:53 AM
07/13/2026 06:57 AM
07/13/2026 06:59 AM
07/16/2026 08:58 AM
07/14/2026 09:18 AM
07/15/2026 01:12 AM
07/15/2026 06:23 AM
07/16/2026 09:19 AM
07/21/2026 09:09 AM
07/16/2026 06:27 AM
07/17/2026 08:27 AM
07/17/2026 08:43 AM
07/21/2026 09:08 AM
07/21/2026 02:52 AM
07/21/2026 06:42 AM
07/21/2026 06:56 AM
07/21/2026 08:05 AM
07/21/2026 08:23 AM
07/22/2026 02:16 AM
07/24/2026 09:09 AM
07/22/2026 09:08 AM
07/22/2026 08:32 AM
07/23/2026 12:59 AM
07/24/2026 09:30 AM
07/23/2026 09:27 AM
07/24/2026 08:16 AM
07/24/2026 08:59 AM
07/24/2026 09:34 AM
 
 
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
1
2
3
4
5
training
Closed 0%
Closed 0%
Closed 0%
Closed 0%
Closed 0%
Closed 0%
Closed 0%
In Progress 0%
In Progress 0%
New 0%

Also available in: PDF PNG